The Morris Operation in Grundy County, , , is the location of the only permanent (the rest are temporary) de facto high-level radioactive waste storage site in the United States and holds 772 tons of spent nuclear fuel.Nuclear Energy Information Service. "'NUCLEAR ILLINOIS' FACTS", Nuclear Energy Information Service, 04/09 It is owned by GE Hitachi Nuclear Energy and located near the city of Morris.GE Hitachi Nuclear Energy. "Application for Importation of LLRW into the Texas Waste Disposal Compact", Anthony E. McFadden, May 29, 2014 The site is located immediately southwest of Dresden Generating Station. Spent nuclear fuel assemblies are stored at this away-from-reactor, Independent Spent Fuel Storage Installation (ISFSI) in a spent fuel storage pool.Energy Information Administration. "Spent Nuclear Fuel Discharges from U. S. Reactors 1993", Energy Information Administration, February 1995Nuclear Regulatory Commission. "General Electric Company; Morris Operation Independent Spent Fuel Storage Installation; Notice of Consideration of Approval of Transfer of Special Nuclear Material License and Conforming Amendment and Opportunity for a Hearing", Nuclear Regulatory Commission, 04/10/2007Congressional Research Service. "Spent Nuclear Fuel Storage Locations and Inventory", Anthony Andrews, December 21, 2004 The storage basins at the Morris Operation store spent high-level radioactive waste from Connecticut Yankee Nuclear Power Plant, Cooper Nuclear Station, Dresden Generating Station, Monticello Nuclear Generating Plant, and San Onofre Nuclear Generating Station. The newest fuel currently in storage has been at the site since 1989, and the basins are essentially full. No new fuel will be received and storage is limited to the current inventory.


Nuclear fuel reprocessing
The facility was originally constructed by General Electric to reprocess spent nuclear fuel, but was never operational in that use. Testing in 1975 revealed that the facility would not operate properly without extensive modifications, and the facility's application for a license to reprocess was withdrawn.
(2025). 9780309096478, National Academies Press.
In 2007 and 2013 proposals were advanced for the completion of the reprocessing facility.

Page 1 of 1
1
Page 1 of 1
1

Account

Social:
Pages:  ..   .. 
Items:  .. 

Navigation

General: Atom Feed Atom Feed  .. 
Help:  ..   .. 
Category:  ..   .. 
Media:  ..   .. 
Posts:  ..   ..   .. 

Statistics

Page:  .. 
Summary:  .. 
1 Tags
10/10 Page Rank
5 Page Refs